Projects management

Projects management

The project management includes all the activities of realization and support, starting from the customer request (request of quotation), and finishing with post-sale support. The process which constitutes our project management procedure is defined below:

Customer requests control

Planning and tracking progress

Management development

Integration and validation

Planning

The planning of the projects development and progression is described below:

Project requirements: explicit and implicit

Identification of stages or phases of the project

Identification of the inputs and outputs for each phase

Phase progression conditions

Identification of the required tools for the design, the developments, and the tests

Project team identification

Definition and attribution of responsibilities for each team member

Project planning.

The expression of these requirements is defined in the quality plan and the project development plan. The management of project risk is considered in the planning.

Safety and confidentiality

TELNET will assume the responsibility for the following safety and confidentiality actions:

Safety of the network:

Isolation of the LAN and implementation of Firewall. The method and the techniques which will be used are studied jointly with our partners.

Protection of the intellectual property:

TELNET has a firm position with respect to the intellectual property. All the TELNET personal adhere to the intellectual properties protection guide specific to the partners.
Share
 
Îíëàéí èãðû ïî ìàòèâàì ñåðèàëîâ è ôèëüìîâ Îíëàéí èãðà ãåéìåðû Îíëàéí èãðà èíòåðíû Îíëàéí èãðà çàêðûòàÿ øêîëà Îíëàéí èãðà ìñòèòåëè Îíëàéí èãðà ñóìåðêè Îíëàéí èãðà òðàíñôîðìåðû Îíëàéí èãðà óíèâåð Îíëàéí èãðà ôîðñàæ Îíëàéí èãðà Íîâûé ×åëîâåê Ïàóê Îíëàéí èãðà "Sims 4" Îíëàéí èãðà "Angry Birds 2013" Îíëàéí èãðà "Minecraft" Îíëàéí èãðà "Simpsons" Ëóäøèå Îíëàéí èãðû Ñáîðíèê Áðàóçåðíûõ èãð 2013 Ëóäøèå Îíëàéí èãðû 2013